To begin with we decided we would shoot the whole film in one day. This would be shot on the 1st March at 4pm. We thought we could get it all done in the space of a few hours as it was a small production which was set in one location - Sutton Park. We thought that is we shot it all at once they wouldn't be continuity errors such as: different lighting etc. But this did change.


Once we got back to the editing suite and watched all the footage, we decided that it wasn't of the high level we wanted it to be and we all knew we could do much better. Therefore we all thought it would be best if we reshoot everything, as there was enough time to allow us to do so.

The first time we filmed gave us the experience we needed as we now knew what to do and what didn't work. It gave us a better idea of how long it would take to shoot each shot etc. Therefore making us a produce a  much better piece of footage. 

After watching the new footage back we decided to reshoot a few sections due to bad camera work and dialogue issues. 
Liam Owen made an extremely detailed production schedule for the second time we was filming. Here are images of that production schedule: 